A Penhallow company - serving Irving, TX
A remodeled primary bathroom with a soaking tub and a walk-in shower

The Complete Bathroom Remodeling Guide for Irving Homeowners

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Irving

Last updated November 17, 2026

A freestanding soaking tub in a remodeled primary bathroom
A walk-in shower with large-format tile and a built-in niche
A remodeled hall bathroom with subway tile and a floating vanity
A remodeled hall bathroom with patterned floor tile and painted walls
A low-threshold walk-in shower with a bench and grab bar
A finished backyard cottage with a small covered porch
A remodeled living room with built-in shelves around the fireplace
A single-story rear room addition with tall windows and a new patio
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

The Complete Bathroom Remodeling Guide for Irving Homeowners

The most common bathroom remodel mistake in Irving isn’t picking the wrong tile. It’s approving a layout that ignores where the drain already sits. Move that drain a few feet and a $4,000 job becomes a $7,000 job the moment the walls come open and the slab has to be cut. Every decision in a bathroom compounds on the one before it: rough-in before waterproofing, waterproofing before tile, permit before demo. This guide maps the whole sequence so Irving homeowners know what to decide, in what order, before anyone lifts a hammer.

Call (844) 320-5939

Quick Answer

A bathroom remodel in Irving typically runs $9,000 to $28,000, and the single biggest driver of that number is whether your existing layout stays put or the drain and supply lines have to move. Most Irving homes built between the 1960s and 1980s sit on slab foundations, which makes drain relocation a concrete-cutting job that needs a permit and an inspection. Keep the fixtures where they are and a mid-range full remodel usually lands in the $9,000 to $16,000 range; relocate the shower drain and you’re adding $2,500 to $4,000 before a single tile is set.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Table of Contents

The Correct Sequence of a Bathroom Remodel

A bathroom is one of the few rooms in a house where the order of work is nearly fixed. Skip a step or move one forward and you either tear out completed work or install something that fails in a year. In our experience, the projects that go sideways are almost always jobs where the order got rearranged for convenience.

Here is the sequence we follow on every bathroom, and the one you should expect from any contractor you hire:

  1. Design and selections. Tile, fixtures, vanity, and lighting get chosen before anything else. You cannot order what you haven’t picked, and you can’t build a substrate to fit a tub that hasn’t arrived.
  2. Permit pulled. In Irving, the permit comes before the first swing of the hammer, not after. More on that below.
  3. Demo. Tear out to the studs and the subfloor. This is where surprises surface, which is why the price should be locked before you start, not after.
  4. Rough-in plumbing and electrical. Supply lines, drain lines, venting, and the electrical for lighting, exhaust fan, and any heated floor.
  5. Inspection. Rough-in gets inspected before it’s covered. Once it’s behind a wall, nobody can verify it.
  6. Waterproofing and substrate. Cement board or a foam board system, then a liquid or sheet membrane over the whole wet area.
  7. Tile. Floor first, then walls, then grout and cure.
  8. Fixtures and finish. Toilet, vanity, faucets, shower trim, mirrors, hardware.
  9. Final inspection and punch list.

Every step depends on the one before it. This is why getting the sequence wrong costs more than getting the product wrong: a $300 tile choice can be changed right up until it’s grouted, but a missed waterproofing step means tearing the whole shower back to studs.

How Irving’s Slab Construction Changes Your Options

A large share of Irving’s housing stock went up between the 1960s and 1980s, and those homes were built on concrete slabs. That’s not unusual for North Texas, but it matters a great deal in a bathroom, because your plumbing runs under concrete rather than through a crawlspace or a basement ceiling. You cannot get to a drain line by walking downstairs and looking up.

What that means in practice:

  • Moving a drain means cutting concrete. A shower drain that shifts two feet requires a saw cut, jackhammering, excavation, new PVC or ABS, backfill, and re-pouring the slab patch.
  • The toilet is the expensive one to move. Toilet drains are large and often the deepest line in the bathroom. Moving a toilet a few inches is usually fine; moving it across the room gets expensive fast.
  • Supply lines are easier than drains. Hot and cold supplies can often be rerouted in the wall cavity without touching the slab.
  • Older Irving plumbing is often galvanized or early copper. If the walls are already open, this is the moment to assess the condition of what’s behind them. Replacing a section of corroded line now costs far less than opening the same wall in two years.

This is why a good contractor asks about drain location before they sketch a new layout. A shower with a center drain is a different job from a shower with a linear drain at the wall, and the difference is measured in concrete, not tile.

What a Drain Relocation Actually Costs

Drain relocation is the single most common source of budget creep in an Irving bathroom remodel. Here’s why: the homeowner sees a beautiful design with a larger shower or a freestanding tub, and the estimate gets written before anyone confirms where the existing drain sits. Then demo day arrives and the number changes.

A drain relocation on a slab foundation encompasses several distinct costs that are easy to underestimate:

  • Concrete cutting and removal: typically $400 to $900 depending on how much slab has to come out.
  • Plumbing re-pipe and venting: usually $600 to $1,400 for the new drain run and any venting adjustments.
  • Slab patch and cure: $250 to $500, plus the wait time before tile can go down.
  • Permit and inspection: plumbing permits typically add $150 to $350 in Irving.

Total for a shower or tub drain move: often $2,500 to $4,000, more if the toilet also moves or if the new location runs into a beam or another buried line. The way to avoid the surprise is to have the drain location confirmed and the layout settled before the written quote is signed. A contractor who gives you a verbal ballpark before looking at your slab is guessing.

Irving Permits and Inspections: What Triggers Them

Not every bathroom project in Irving needs a permit, but the ones that do are not negotiable, and skipping the permit is a mistake that stays with the house long after the job is done. Unpermitted work is a real problem when you sell: it shows up on a disclosure, and it can force a buyer to ask for a re-inspection or a credit.

Projects that typically trigger a permit in Irving:

  • Any plumbing relocation. Moving a drain or supply line requires a plumbing permit and an inspection of the rough-in.
  • Electrical changes. New circuits, added outlets, relocated lighting, or a new exhaust fan tied to a switch.
  • Structural changes. Removing or moving a wall, even a short one, requires a check that it isn’t load-bearing.
  • Converting a tub to a shower or vice versa. Often touches both plumbing and the shower pan assembly.
  • Adding a bathroom where none existed. Full permits for plumbing, electrical, and framing.

Cosmetic work like new paint, a vanity swap that doesn’t move plumbing, or a like-for-like fixture replacement generally doesn’t require a permit. If you’re uncertain, call and ask. The cost of a permit is trivial compared to the cost of tearing out unpermitted work to make it legal later. If your project turns into a broader whole-home remodel, you can read more about what that involves in our guide to a general contractor in Irving.

How to Spec a Quote So Nothing Gets Left Out

The finish tile is the visible half of a bathroom. The layer underneath it is where the real quality lives, and it’s also where under-specified quotes quietly leave things out. A quote that names only the tile and the vanity is not a complete quote.

Here is what a proper written scope should name line by line:

  • Substrate. Cement board or a foam tile backer board. This is the layer the tile actually adheres to.
  • Waterproofing membrane. A liquid-applied or sheet membrane over the shower walls and pan. On a slab, this is what stops water migrating into the concrete and up into the adjacent room.
  • Shower pan assembly. Pre-formed pan or a site-built pan with proper slope. This is not something to improvise.
  • Vapor barrier and insulation where the walls are open.
  • Exhaust fan capacity. Sized to the room’s cubic footage, ducted to the exterior, not into the attic.
  • Grout and sealant. Epoxy grout in the shower and a matching 100% silicone sealant at the joints, not caulk.
  • Permit and inspection fees as a line, not an estimate.

If the quote is one number for “bathroom remodel,” ask for the breakdown. A written price before any work starts is the standard we hold to, and it means you can compare two quotes line by line and see what’s missing. And when the work is done, the finish matters: whether the tile, the plumbing, and the warranty all hold up is the subject of our bathroom remodeling in Irving page.

Lead Times: What to Order Before Demo

In North Texas, the things most likely to stall a bathroom remodel are not the tile and not the plumbing. They’re the items you order late. A bathroom torn down to studs waits for whatever hasn’t arrived, and a two-week shipping delay turns a two-week job into a month.

Order these before demo, in roughly this order of urgency:

  1. Freestanding or alcove tub. Six to twelve weeks for many lines, and it dictates the rough-in dimensions. Tub goes first, always.
  2. Vanity and cabinet. KraftMaid and Wellborn both run weeks out on non-stock configurations. A stock vanity is a day; a custom one is a month.
  3. Shower door or glass enclosure. Fabricated to final tile dimensions, so it can’t be ordered until tile is set, but the lead time should be booked into the schedule on day one.
  4. Tile. Stock tile is quick; special order or a curated pattern can be several weeks.
  5. Fixtures. Kohler and Moen faucets, shower trim, and drains are usually available, but certain finishes and trim sets run long.
  6. Countertop. Cambria, Silestone, and Caesarstone all require a template after cabinetry is set, plus a fabricator lead time of one to three weeks.

The rule: nothing arrives on demo day that could have arrived a month earlier. A good contractor will give you a selection deadline and order from it, not wait for you to remember.

What a Bathroom Remodel Costs in Irving

Cost depends on size, scope, and whether the layout moves. Here’s a rough line-item picture for a typical Irving hall bath in the 40 to 60 square foot range.

  • Demo and haul-away: $600 to $1,200
  • Plumbing rough-in: $800 to $1,500 (more if drains relocate)
  • Drain relocation, if needed: $2,500 to $4,000
  • Electrical rough-in and exhaust fan: $500 to $1,100
  • Substrate, waterproofing, and pan: $1,200 to $2,200
  • Tile and installation: $1,800 to $4,500 depending on tile and pattern
  • Vanity and countertop: $900 to $3,500
  • Fixtures: $500 to $1,800
  • Permit and inspection: $150 to $500

Add those up and a mid-range full remodel generally lands between $9,000 and $16,000, or $16,000 to $28,000 for a primary bath with a larger shower and higher-end finishes. The difference between the low and high end is mostly driven by whether the drain moves, how large the tile is, and which cabinet and countertop line you pick. None of that should be a mystery after the walkthrough. And if you’re also planning to touch the room next door, our kitchen remodeling in Irving guide covers the same decision sequence for kitchens.

Common Mistakes to Avoid

  • Approving a layout without checking the drain location. This is the Irving-specific one. A plan that looks clean on paper can read as a $3,000 surprise once the slab opens up.
  • Selecting finishes before the rough-in. Pick a freestanding tub after the rough-in is set and the drain may land in the wrong spot for it, forcing a redo.
  • Skipping the waterproofing membrane over cement board. Cement board is not waterproof; it’s water-resistant. The membrane is what actually protects the assembly.
  • Ordering fixtures after demo. Tub, vanity, and tile lead times are the most common reason a bathroom sits empty for three extra weeks.
  • Venting the exhaust fan into the attic. In North Texas humidity, that’s a recipe for attic condensation and future damage. It has to vent outside.
  • Accepting a verbal estimate. A number that isn’t written down is a number that can change at the door. Ask for it in writing.
  • Skipping the permit to save a few hundred dollars. Unpermitted plumbing is a problem that surfaces at the worst possible time: when you go to sell.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

When to Call a Professional

A tile setter installing wall tile in a shower

Some bathroom projects are within reach of a handy homeowner: a vanity swap, a fresh coat of paint, a new mirror, a faucet that’s a straightforward replacement on existing supply lines. But three areas are not good candidates for a weekend project. The first is anything that moves a drain or reroutes a supply line, because it means opening concrete or a wall and getting the fall and venting right. The second is the waterproofing and shower pan assembly, which is the layer you can’t see and the one that fails quietly. The third is any electrical work, from a new exhaust fan to a GFCI outlet inside the room. A licensed general contractor is worth the money here because the failure modes are expensive and often invisible until they’ve done real damage.

If your project touches any of those three, or if you just want a written number before you commit to a scope, call us. Penhallow Remodeling Irving offers free estimates in Irving, and we’ll walk the room, confirm the drain location, and put the price and the guarantee in writing before work starts. Call (844) 320-5939.

Frequently Asked Questions

The Bottom Line

A wide opening with a new beam where the kitchen wall was removed

A bathroom remodel in Irving succeeds or fails on sequence, not on tile selection. In this guide we’ve covered why drain location comes before layout, why waterproofing comes before tile, why permits come before demo, and why lead times come before everything. A written price that accounts for substrate, membrane, and plumbing is worth more than a beautiful rendering, because the rendering doesn’t show what’s underneath. If you take one thing away: get the sequence and the written number right before the first swing, and the finished room will hold up for the long haul. Start with your layout and your drain location, confirm both, and the rest follows.

Ready to plan your Irving bathroom remodel? Our technicians have up to 22 years of experience and arrive in uniform, background-checked, with a written guarantee on every project. Penhallow Remodeling Irving operates under the Kingswell 365-Day Done Right Promise: if the work fails inside the warranty period, we come back and fix it at no charge. Every job gets a written price before any work starts, a real arrival window, and a clean job site. Call (844) 320-5939 for a free estimate. A live person answers the phone. To learn more about who we are, visit the Penhallow Remodeling Irving home page.

Written by the team at Penhallow Remodeling Irving.

Getting started with Penhallow in Irving

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your Irving team

A local vetted partner works across Irving and the towns around it, to the same written standard as every Penhallow job.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Irving? Licensed & insured · free written estimates
Call (844) 320-5939
Local Service Coverage

Request a Free Estimate in Irving

Tell us what you need - Penhallow Remodeling Irving responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch